ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

which is one important element of romantic literature
micah is studying child behavior in playgrounds throughout the world. He wants to see how the children react when teachers select the same child to be the first
Subtract 1/4w+4 from 1/2w+3 . help please
Correct the sentence below: The pizza delivery boy was neither early nor late he was right on time. A: Correct as it is B: The pizza delivery boy was
what does the quadrilaterals on a kid with her art class it is possible to draw a parallelogram that is not a rectangle explain
What best describes feudalism
Briefly explain one significant contribution of either scientific management or regulatory commissions to the Progressive Movement
Thesis statement for negative effects on immigration
what does X represent in the formula for the compound XCl4?
What do lava flows made of aa indicate about the type of volcanic eruption that occurred? A. The eruption was viscous. B. The eruption was pyroclastic. C. The