krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

What is the meaning of the root word caust
4x^2-28x+49=5 solve the quadratic by completing the square
What is sociocultural ?
How did rationing support the war effort in ww2?
Donald Johanson, Tom Gray, and others discovered a hominid that lived in East Africa__________ million years ago and nicknamed her Lucy, whose scientific name t
What is the meaning of the root word caust
Two numbers have a product of 48 and a sum of 19 what are the numbers and how do you know
A rectangular bedroom floor has an area of 100 square feet and a length of 10 feet. What is the perimeter of the floor?
what are the factor pairs of 38
What is 5.207 as a fraction?