ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

Over what period of time would you expect to see large changes in mountains,canyons,and similar features of the earth?
1. What is the respiratory structure of a millipede? A. book lungs B. tracheal tube C. gill slits 2. what is the respiratory structure of a spider? A. gills B.
what It Trigonometry ?
why did  the volcano explode
The following statements about carbon dioxide are true EXCEPT a. It can be prepared by the action of acid on CaCO₃ b. It is used in fire extinguishers c. It d
What two factors determine the state of rocks and metals Inside the earth?
What is the product of (x+1) and (2x^2+3x-1)?
what type of fractions are the following A) 1/3 A) Improper B) mixed C)wholeB) 5 1/6C) 6/5answer A B C with the three multiple choice answers.
Help??? What is 3x+5x=67y?
What challenges did the californios face?