nmartin7537 nmartin7537
  • 04-01-2021
  • Mathematics
contestada

It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

Select the correct answer. Lewis saved $450 for a new laptop. At a local computer store, Lewis decides to purchase a laptop with a sticker price of $429.99. The
Here is a rectangle. 4.3 cm 7 cm 7 cm 4.3 cm The 6-sided shape is made from two of these rectangles. Work out the perimeter of this 6-sided shap
A theme is the conveyed in the text. A be Save and Exit Next Submit Mark this and return
K+1 P-3 what is the formula for this ionic compound ? And the name ?
An object on a number line moved from x = 15 cm to x = 165 cm and then moved back to x = 25 cm, all in a time of 100 seconds. What was the average velocity of t
Which molecule produces the most ATP?​
A caterer charges a fixed cost for preparing a dinner plus an additional cost for each person served. You know that the cost for 100 students will be $1100 and
What’s the correct answer for this? Select all the ones that apply
Solve for r. –7r = –8r − 20 r =
Complete the square please.