Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

a soccer team played 160 games and won 65% of them. how many did they win?
the area of a triangle is 41 yards to the second power with a base of 5 yard what is the height in yard
how might a scientist a determine  whether trait sex-linked by observing the offspring of several genetic crosses
Luke made a model that has 1 circular base and 1 curved surface.what solid figure did he make
Why were the 1920's considered the best and worst of times?
How do you work out the problem 84 divided by4
How did the depression affect women and children?
the area of a triangle is 41 yards to the second power with a base of 5 yard what is the height in yard
Rico is making4 batches of mexican rice. each batch needs 2/3cup of corn. He only has a1/3-cup measure.How manytimes must Rico measure 1/3cup of corn to have en
what is the simplest square root of 1345? no decimals please